CASE STUDIES

Nitrogen Generation Systems & Corrosion Monitoring Systems

Out of the thousands of success stories we’ve had, we’ve selected a wide variety of case studies positioned in various industries and with different risk factors, and made them available here. As experts in the use of corrosion management technology, we continue to engage in active research and discover empirical field results that provide the most convincing data for anyone considering the deployment of a corrosion control strategy in their fire sprinkler system.

Filters:

Indiana Warehouse WPNI

This large facility needed a WPNI strategy to fight localized corrosion around pockets of trapped air in the black steel piping.
Read Now

Illinois Distribution Center WPNI

With severe corrosion found at the air/water interface in high points of the black steel piping, we applied WPNI technology to repair and prevent future leaks.
Read Now

Mission Critical Data Center DPNI

After leaks began to develop in the 3” glavanized schedule 10 main piping, this facility needed a DPNI strategy to prevent future leaks.
Read Now

In-Line Corrosion Detector MONITORING

Hydrostatic testing of the facility’s preaction fire sprinkler system resulted in two early-warning corrosion detections by the ILD-X.
Read Now

Arizona Home Improvement Center WPNI

With a frequent leak history and a high risk of business continuity disruption and product damage, this facility needed a long-term solution.
Read Now

California Mall WPNI

With an average of one corrosion-related leak every two weeks in 2014, this mall had a high risk of damaging tenant goods and interfering with business operations.
Read Now

California Mission Critical Manufacturing WPNI

With a high risk of leak repair and pipe replacement (complete replacement of some zones), this aerospace manufacturer protected its systems with our WPNI technology.
Read Now

Florida Regional Mall WPNI

With leaks in tenant space and common mall areas, and the risk of merchandise damage, this Florida mall needed our help to inert its 36 wet pipe systems.
Read Now

Cold Storage/Freezer Application DPNI

After leaks began to develop in the 3” glavanized schedule 10 main piping, this facility needed a DPNI strategy to prevent future leaks.
Read Now

Data Center in the Atlanta, GA Region Black Steel Wet Systems

Project Background Large warehouse located in Indiana, open floor construction with stacked storage racks. 450,000 sq. of fire sprinkler system coverage area with 12 individual wet pipe risers serving the building. Average zone volume 1,800 gallons. 6” mains with 2” branch lines following the roof pitch to the center of the building; 4” floating main at far end of branch lines.
Read Now

Nationwide Distribution Centers Black Steel Wet Systems

Project Background Large warehouse located in Indiana, open floor construction with stacked storage racks. 450,000 sq. of fire sprinkler system coverage area with 12 individual wet pipe risers serving the building. Average zone volume 1,800 gallons. 6” mains with 2” branch lines following the roof pitch to the center of the building; 4” floating main at far end of branch lines.
Read Now

Big Box Stores Corrosion Risk Assessment

This large facility needed a WPNI strategy to fight localized corrosion around pockets of trapped air in the black steel piping.
Read Now

Get Your Project Started with ECS Today

Learn More